Our First Hard Hat Experience
Dr. Ramirez and I just had our first experience with hard hats. We toured Hollibrook Elementary to see the wall finishes, cabinetry, colors and other architectural features. We trooped along behind the architects in our hard hats with our camera. It was fun!
Below is a set of cabinets at Hollibrook. Ours won't be just like these but close enough.
Sunday, January 17, 2010
The First Posting
News from Meadow Wood regarding the move to the South Transition Campus at Westchester Academy of International Studies, the planning and design of the new MWE and the move back to the new MWE! Postings here will keep you up to date on the latest developments.
Currently we have completed the schematic design phase for the new building and the transition campus. The plan is for us to move out of MWE June 7-11 and move into the Transition campus to begin school in August 2010. Demolition of the current MWE and new construction at the site should begin in the summer of 2010. The most optimistic plan puts us at the Transition campus from August 2010 - June 2011 and then moving back into the new MWE in August 2011. Keep your fingers crossed.
Watch as the look of this blog changes and latest developments are posted, hopefully, weekly.
Currently we have completed the schematic design phase for the new building and the transition campus. The plan is for us to move out of MWE June 7-11 and move into the Transition campus to begin school in August 2010. Demolition of the current MWE and new construction at the site should begin in the summer of 2010. The most optimistic plan puts us at the Transition campus from August 2010 - June 2011 and then moving back into the new MWE in August 2011. Keep your fingers crossed.
Watch as the look of this blog changes and latest developments are posted, hopefully, weekly.